Fort Smith, AR
Home MenuAlleyway Rehabilitation Project
Alleyway Rehabilitation Project
The City of Fort Smith's Alleyway Rehabilitation Project is a transformative initiative to convert underutilized alleys into safe, accessible multi-use corridors. This project is fully funded by a federal grant as part of a larger $14.5 million grant from the Climate Pollution Reduction Grant (CPRG) program aimed at enhancing environmental stewardship and community resilience in Fort Smith.
Key Features of the Alleyway Rehabilitation Project:
-
Conversion of Alleyways:
- Scope: The project will transform 11,510 linear feet of existing alleyways into multi-use paths.
- Purpose: This conversion aims to improve community connectivity, combat urban blight, and provide safe, sustainable transportation options for residents.
-
Encouraging Sustainable Transportation:
- Walking and Cycling: By creating multi-use paths, the project encourages walking and cycling, reducing reliance on motor vehicles and thereby lowering greenhouse gas emissions.
- Connectivity: The enhanced alleyways will connect critical amenities within the community, making it easier and safer for residents to access schools, parks, and commercial areas.
-
Environmental and Social Benefits:
- Emission Reduction: Encouraging non-motorized transportation modes will contribute to the reduction of greenhouse gas emissions.
- Community Health: Improved walkability and bikeability promote physical activity and overall community health.
- Aesthetics and Safety: The rehabilitation will also focus on improving the visual appeal and safety of these urban spaces, potentially incorporating elements like better lighting and landscaping.
-
Support for All Residents:
- The project is designed to benefit all residents, with a particular focus on providing safe and accessible transportation options, thereby enhancing equitable access to city amenities.
Construction Details
Alleyway rehabilitation has been divided into four projects:
- N C ST - Tilles Ave (2,848 LF)
- N 16th St - Belle Ave (1,903 LF)
- N E St - N O St (3,240 LF)
- Garrison Ave - N N St (4,897 LF)
Improvements will include:
- A 12-foot-wide concrete walkway
- One-foot green space bands with native vegetation
- New LED lighting installed by OG&E
